Irrigation
Batman;
- In Batman right and left bank irrigations main canal construction works (292 km in total) will be completed.
- Batman right bank (18,193 hectares) and left bank (17,903 hectares) irrigation network will be completed.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
Kilis;
- Land consolidation and on-farm development works will be completed; 1 Projects, 1,400 hectares
Mardin;
- To serve an area of 94,929 hectares, 136 km long Mardin-Ceylanpınar main canal construction will be completed.
- Mardin-Ceylanpınar (67,106 hectares) and Mardin gravity storage (27,883 hectares) and Mardin Ceylanpınar Groundwater (YAS) (111,939) irrigation networks will be given start and most of the construction will be completed until the end of the period.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
- Land consolidation and on-farm development works will be completed; 3 Projects 117.581 hectares
Adıyaman;
- Constructions related to remaining 3,811 hectares in Çamgazi irrigation and remaining 2,246 hectares in Samsat pumped irrigation Part I will be completed.
- Adıyaman Koçali Dam irrigation network (21,605 hectares) will be completed.
- To serve an area of 71,598 hectares, Çetintepe Main Storage and intermediary storages as well as main canal constructions (636 km) will be given start in the programme period and largely completed in the same period.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
- Land consolidation and on-farm development works will be completed; 2 Projects 29.613 hectares
Diyarbakır;
- In Kralkızı-Dicle Part I gravity and pumped irrigations main canal (60 km in total) and network (17,729 hectares) constructions will be completed.
- 97.893 hektara hizmet edecek, 202 km uzunluğundaki Kralkızı-Dicle I. ve II. Merhale Projeleri Ana Kanal inşaatı tamamlanacaktır.
- Kralkızı-Dicle I. ve II. merhale projeleri sulama şebekelerine (97.893 hektar) başlanacak ve dönem sonuna kadar inşaatların büyük kısmı tamamlanacaktır.
- To serve an area of 193,249 hectares, Silvan Dam and intermediary storages as well as main canal constructions (636 km) will be given start in the programme period and largely completed in the same period.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
- Land consolidation and on-farm development works will be completed; 10 Projects 371.351 hectares
Gaziantep;
- Kayacık Plain main canal (34 km) and Belkıs-Nizip main canal (43 km) construction works will be completed.
- Kayacık Plain (18.800 hectares) and Belkıs-Nizip (11.925 hectares) irrigation networks will be completed.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
- Land consolidation and on-farm development works will be completed; 4 Projects 107.329 hectares
Şanlıurfa;
- Upper Harran main canal will be completed up to 86th km. In Upper Harran Plain irrigation (2,888 hectares) and Harran Plain irrigation 6th Part (7,974 hectares) related constructions will be completed.
- To serve an area of 57,927 hectares, Suruç Stage I 160 km long main canal construction will be completed.
- Suruç Stage I irrigation network (57,927 hectares) will be started and most of the construction will be completed until the end of the period.
- Expropriations will be effected in line with work programme in ongoing constructions and in those to be started in the programme period.
- Land consolidation and on-farm development works will be completed; 9 Projects 554.665 hectares
| III. INFRASTRUCTURAL DEVELOPMENT | |||||
|---|---|---|---|---|---|
| No | Action Title | Location | Charge | Institutions to be cooperated | Starting-Completion Date |
| AG.1.1 | In projects under construction, priority will be given to main canal construction. | Adıyaman, Batman, Diyarbakır, Şanlıurfa, Gaziantep | DSİ | 1986-2009 | |
| AG.1.2 | Main canal construction will be started in priority (with water source already available) projects and a large part will be completed until the end of the period. | Diyarbakır, Şanlıurfa, Mardin | DSİ | 2008-2012 | |
| AG.1.3 | Irrigation network constructions in priority (with water source already available) projects will be completed | Batman, Diyarbakır, Şanlıurfa, Gaziantep, Adıyaman, Mardin | DSİ | 2008-2012 | |
| AG.1.4 | Dam and main canal constructions will be started in yet without ready water storage facilities. | Adıyaman, Diyarbakır | DSİ | 2008-2012 | |
| AG.1.5 | Expropriations will be effected in ongoing constructions and in those to be started in the programme period. | Batman, Diyarbakır, Şanlıurfa, Gaziantep, Adıyaman, Mardin | DSİ | 2008-2012 | |
| AG.1.6 | On-farm drainage Works will be completed. | GAP Provinces | DSİ | 2008-2012 | |
| AG.1.7 | Land consolidation and on-farm development works will be completed. | Batman, Diyarbakır, Şanlıurfa, Gaziantep, Adıyaman, Mardin, Kilis | GDLR | MoF, GDTDC, DSI, SPA | 2008-2012 |